Building work done without council-approved plans can be stopped, fined and can hold up a sale. As-built plans are how you legalise what is already there.

A floor plan cut from a lidar scan of an existing building
A floor plan taken from a lidar scan of an existing building.

What the law says

Under the National Building Regulations and Building Standards Act (Act 103 of 1977), plans must be approved before building starts. Genuinely minor work can be exempted, but the council makes that decision, not the owner.

The risks

  • Stop orders and fines. A building inspector can order the work stopped, and the owner can be fined.
  • Demolition. In serious cases, unapproved work can be ordered down, even years later.
  • Inherited problems. Owners are liable for illegalities they inherit, even if they did not build them. Most buyers want it sorted before transfer, and banks may refuse a bond where additions have no approved plans.
  • Insurance. Unapproved alterations can complicate a claim.

How to put it right

You submit as-built plans: accurate drawings of what is actually there, approved after the fact. It can cost more than doing it correctly the first time, and the council may require changes so that the building complies. Paying a fine does not make the building legal on its own.

Where the work also crosses a building line, or goes against the zoning scheme, a relaxation or consent application runs alongside the plans.

Some illegalities have no records at all to refer back to. We have regularised town planning and land use illegalities dating back as far as 1940.

How we do it

  1. Scan and measure. We walk the building with a lidar scanner, so every wall, opening and level is measured, and we measure the crucial areas.
  2. Draw. Plans, sections and layouts are cut straight from the scan.
  3. Check and advise. We check the result against zoning, building lines and your title deed, and advise on compliance, including how the building can be altered or adjusted to comply with SANS 10400. Where it is needed, we recommend an engineer, appointed by the owner.
  4. Engineering and assessments. We tell you which engineering services and assessments the council requires. The owner appoints the engineer, and we work with them.
  5. Submit. We submit to the council and follow it through.

The same scan can also be used for pre-project reviews and audits, to confirm the existing conditions of a property before you commit to a design. It also keeps a digital record of the building as it stands. See Lidar scanning.

Further reading

Where we have relied on outside sources, here they are, so you can read them yourself.

This is general information, not legal advice. Rules differ between municipalities, so check yours or speak to us.

Speak with a registered professional.

Send us the erf number and what you want to do.

Start a project →